AO11S Inst Conf Changes - INTEGRAL
Instrument configuration changes since AO11 (March 2013)
IBIS, JEM-X, OMC
No changes since March 2013.
SPI
The 21st SPI annealing started on August 01, 2013 and the camera was switched on again on August 22, 2012. The energy resolution has been fully recovered, slightly better than by the last annealings. The SPI energy resolution at 1764.3 keV was recovered to 3.07 keV. A graph updating that shown in the AO-11 SPI observer's manual, page 21 is provided here.