GS Meeting 11 - INTEGRAL
Presentations and other material from the
Integral GS Coordination Meeting 11
M. Schmidt: ARTS SC Anomalies
Report on SPI SEU 01 Dec 2005
J.P. Roques: SPI status
P. Ubertini: IBIS status, Crab calibrations, Bright Sources
P. Ubertini: ISGRI response status
S. Brandt: JEM-X status
P. Kretschmar: ISOC status
G. La Rosa: IBIS operations, options for TM reduction
M.Schmidt: GS CR Belt Passage
Perigee altitude Rev 500-2000 (Nov 2006 - Feb 2019)
R. Walter: ISGRI geometric calibration
C. Budtz Jørgensen: JEM-X thermal alignment effects
Alenia: Pointing & Alignment Budget
Alenia: Layout of Heaters & Thermostats
F. Lebrun: Reducing ISGRI bkg & ghosts
J.P. Roques: SPI survey
INTEGRAL Radiation Environment (July 2002)
Southampton report on lowering perigee altitude (June 2002)
Weidenspointner: Effect of radiation belts on SPI bkg (Oct 2002)
TN on Rescue Orbits (June 2002)