IOCG Closed Actions

 
Action# On Description Status
IOCG/04-04 ISOC Coordinate improved model for belt exit prediction with MOC. Model done by GB. To be checked again in future.
IOCG/04-03 R. Southworth Set up monitoring of  Earth Albedo effect on solar arrays. Done, only available for part of the time, e.g., not in eclipse
IOCG/04-01 R. Southworth Check replacement options for FTS machine at ISDC. Done, in hands at ISDC
IOCG/03-05 IBIS Team Settle question on NPHS parameters for Bright source handling Done
IOCG/04-06 L. Natalucci, E. Jourdain, N.J. Westergaard Define a baseline for cross-calibration. Defined at IACHEC Meeting, Frascati
IOCG/03-01 S. Brandt
M. Walker
Devise procedure to handle DFEE anomaly with less impact. Procedure developed
IOCG/03-04 ISDC
MOC
Provide more detailed statistics on data distribution delays, i.e., breakdown of delays due to CD production, CD shipping, pipelines, archive & distribution. Information provided at IUG meetings
IOCG/03-03 S. Brandt
ISDC
Update Known Issues and manuals Done
IOCG/03-07 ISGRI Team
ISDC
Improve documentation on limitations for ISGRI analysis Done
IOCG/03-06 JEM-X Team Define sequence of anode disabling for Bright source handling Inputs sent
IOCG/03-02 ISDC Describe possible problems in implementing lossy compression in detail. Closed, not sufficient to not change.
IOCG/02-01 J.-P. Roques
F. Codero
Devise smarter alert strategy for SPI Closed, obsolete
Co/08-03 G. La Rosa Provide information necessary to have the Commanding and Telemetry database up to date for the redundant unit. Closed with IOCG/01-01
IOCG/01-01 S. Fahmy,
G. La Rosa
Organize meeting to discuss remaining issues on redundant chain and other questions Closed 
IOCG/01-05 IBIS Team Provide a study of TM loss effects

Closed, no problems so far

IOCG/02-02 ISOC Organize calibration meeting (ESTEC) Closed
IOCG/01–03 MOC Comment on possibility to leave JEM-X HV switched on during eclipse. Closed, more difficult than first thought
IOCG/01-04 M. Walker,
E. De Miguel
Change OMC CCD temperature limit in database Closed
IOCG/01-01 S. Fahmy,
G. La Rosa
Organize meeting to discuss remaining issues on redundant chain and other questions Closed, meeting on 23 Mar 2009
IOCG/01-09 M. Schmidt Investigate amount of support required to keep the IBIS GS hardware active Closed
IOCG/01-08 J.P. Roques Repeat time correlation check using the information provided by RS Closed
IOCG/01-07 R. Southworth Provide updated TCO data Closed
IOCG/01-02 S. Fahmy Update database to make new MCM value of 20000 the normal setting. Closed
IOCG/01-06 R. Southworth,
S. Fahmy
Simulation of TM usage. Statistics of frequency of TM saturation. Closed
Co/11-11 N.Lund Look into whether hex dither is better for JEM-X than inner raster points using Crab calibrations early in the mission. Closed, no major effect.
Co/12-01 All instrument PIs Define safe configurations and procedures for instruments
left unattended for long intervals
Closed
Co/13-07 R. Southworth &
F. Di Marco
Run test on simulator. Provide short report on possible side effects of reassigning 3 TM packets and CDMU changes. Closed
Co/13-06 S. Fahmy Contact G. Sarri to obtain information w.r.t. the cryocooler to clarify the required contingency procedures in case of anomalies. Closed
Co/13-05 F. Cordero &
J.P. Roques
Review existing procedures regarding SPI HV problems and report. Closed
Co/13-04 J.P. Roques Issue formal request for SPI HV tuning. Closed, not required
Co/13-03 P. Kretschmar Check for suitable target revolutions for SPI HV tuning. Closed
Co/13-11 P. Kretschmar Follow up on problems in Crab calibration and report. Closed  
Co/13-10 A. Parmar Propose a scheme how to involve PIs formally in the future. Closed, IOCG proposed
Co/13-09 R. Southworth Circulate new IP addresses and timeplan for changes. Closed
Co/13-08 V. Beckmann Inquire about time correlation processing and make time correlation files available to instrument teams for testing. Closed
Co/13-02 A. Bazzano Take decision on PICsIT settings for slews. Closed
INTGSCCR-87
Co/13-01 S. Fahmy &
F. Di Marco
Organize meeting MOC/IBIS on redundant unit in December Closed. Mtg on 03 Dec
TWG/04 G. La Rosa Check if PICsIT PPM during slews could be stopped. Closed by INTGSCCR-87 (Dec 2007)
TWG/03 P.Ubertini &
J.-P. Roques
Discuss within their teams and report on possible set up for observations of very bright transients. Closed at IUG/ISWT Meeting, Mar 2007
Co/11-08 N. Lund Discuss required changes for JEM-X UM with Salma Fahmy Closed
Co/11-12 SPI Team Check warnings in Integral AO documentation on use of hex pattern and comment. Closed for AO5
Co/11-05 A. Parmar Have radiation dose analyses get started/done for various orbital scenarios. Closed, see MEOR
Co/11-02 S. Brandt Notify MOC of procedure change at start of eclipse season to avoid JEM-X activation problems. Closed
Co/11-01 G. La Rosa Send updated alert value for PMT 28V to MOC Closed
Co/11-04 M.Schmidt Update report on belt passages taking into account future orbital evolution Closed by circulated TN 19.12.
Co/11-03 P. Kretschmar Provide statistics on use of Hex pattern and other patterns. Closed by mail 01-Dec-2006
Co/11-06 M.Schmidt Provide list of possible changes in MOC support to PIs. Closed by mail 04-Dec-2006
Co/11-09 M.Schmidt Send to PK report by Alenia on AOCS performance and mask temperature. Closed by mail 04-Dec-2006
Co/11-10 M.Schmidt Find out which of the two startrackers is used and inform PIs. Closed by mail 04-Dec-2006
TWG/01 P. Kretschmar Check with ISDC which changes need to be implented for changed SPI TM. Closed
TWG/02 ISOC Evaluate effects of changing minimum pointing time to at least 2400 s. Closed
27-Nov-2006
Co/10-01 R. Southworth See with Flight Dynamics if table as requested by JPR can be provided. Closed
Co/10-02 G. La Rosa Confirm that 1 TM packet for JEM-X can be taken from IBIS TM share for Earth observations. Closed
22-Dec-2005
Co/10-03 E. Kuulkers Discuss with IBIS team possibility of having same risetime
settings in OMC FFCal as in normal observations.
Closed by GS-CR on 22-Mar-2006
Co/10-04 Instrument Teams Check-out of instrument station readiness. Closed