IOCG Closed Actions - INTEGRAL
IOCG Closed Actions
Action# | On | Description | Status | |
IOCG/04-04 | ISOC | Coordinate improved model for belt exit prediction with MOC. | Model done by GB. To be checked again in future. | |
IOCG/04-03 | R. Southworth | Set up monitoring of Earth Albedo effect on solar arrays. | Done, only available for part of the time, e.g., not in eclipse | |
IOCG/04-01 | R. Southworth | Check replacement options for FTS machine at ISDC. | Done, in hands at ISDC | |
IOCG/03-05 | IBIS Team | Settle question on NPHS parameters for Bright source handling | Done | |
IOCG/04-06 | L. Natalucci, E. Jourdain, N.J. Westergaard | Define a baseline for cross-calibration. | Defined at IACHEC Meeting, Frascati | |
IOCG/03-01 | S. Brandt M. Walker |
Devise procedure to handle DFEE anomaly with less impact. | Procedure developed | |
IOCG/03-04 | ISDC MOC |
Provide more detailed statistics on data distribution delays, i.e., breakdown of delays due to CD production, CD shipping, pipelines, archive & distribution. | Information provided at IUG meetings | |
IOCG/03-03 | S. Brandt ISDC |
Update Known Issues and manuals | Done | |
IOCG/03-07 | ISGRI Team ISDC |
Improve documentation on limitations for ISGRI analysis | Done | |
IOCG/03-06 | JEM-X Team | Define sequence of anode disabling for Bright source handling | Inputs sent | |
IOCG/03-02 | ISDC | Describe possible problems in implementing lossy compression in detail. | Closed, not sufficient to not change. | |
IOCG/02-01 | J.-P. Roques F. Codero |
Devise smarter alert strategy for SPI | Closed, obsolete | |
Co/08-03 | G. La Rosa | Provide information necessary to have the Commanding and Telemetry database up to date for the redundant unit. | Closed with IOCG/01-01 | |
IOCG/01-01 | S. Fahmy, G. La Rosa |
Organize meeting to discuss remaining issues on redundant chain and other questions | Closed | |
IOCG/01-05 | IBIS Team | Provide a study of TM loss effects |
Closed, no problems so far |
|
IOCG/02-02 | ISOC | Organize calibration meeting (ESTEC) | Closed | |
IOCG/01–03 | MOC | Comment on possibility to leave JEM-X HV switched on during eclipse. | Closed, more difficult than first thought | |
IOCG/01-04 | M. Walker, E. De Miguel |
Change OMC CCD temperature limit in database | Closed | |
IOCG/01-01 | S. Fahmy, G. La Rosa |
Organize meeting to discuss remaining issues on redundant chain and other questions | Closed, meeting on 23 Mar 2009 | |
IOCG/01-09 | M. Schmidt | Investigate amount of support required to keep the IBIS GS hardware active | Closed | |
IOCG/01-08 | J.P. Roques | Repeat time correlation check using the information provided by RS | Closed | |
IOCG/01-07 | R. Southworth | Provide updated TCO data | Closed | |
IOCG/01-02 | S. Fahmy | Update database to make new MCM value of 20000 the normal setting. | Closed | |
IOCG/01-06 | R. Southworth, S. Fahmy |
Simulation of TM usage. Statistics of frequency of TM saturation. | Closed | |
Co/11-11 | N.Lund | Look into whether hex dither is better for JEM-X than inner raster points using Crab calibrations early in the mission. | Closed, no major effect. | |
Co/12-01 | All instrument PIs | Define safe configurations and procedures for instruments left unattended for long intervals |
Closed | |
Co/13-07 | R. Southworth & F. Di Marco |
Run test on simulator. Provide short report on possible side effects of reassigning 3 TM packets and CDMU changes. | Closed | |
Co/13-06 | S. Fahmy | Contact G. Sarri to obtain information w.r.t. the cryocooler to clarify the required contingency procedures in case of anomalies. | Closed | |
Co/13-05 | F. Cordero & J.P. Roques |
Review existing procedures regarding SPI HV problems and report. | Closed | |
Co/13-04 | J.P. Roques | Issue formal request for SPI HV tuning. | Closed, not required | |
Co/13-03 | P. Kretschmar | Check for suitable target revolutions for SPI HV tuning. | Closed | |
Co/13-11 | P. Kretschmar | Follow up on problems in Crab calibration and report. | Closed | |
Co/13-10 | A. Parmar | Propose a scheme how to involve PIs formally in the future. | Closed, IOCG proposed | |
Co/13-09 | R. Southworth | Circulate new IP addresses and timeplan for changes. | Closed | |
Co/13-08 | V. Beckmann | Inquire about time correlation processing and make time correlation files available to instrument teams for testing. | Closed | |
Co/13-02 | A. Bazzano | Take decision on PICsIT settings for slews. | Closed INTGSCCR-87 |
|
Co/13-01 | S. Fahmy & F. Di Marco |
Organize meeting MOC/IBIS on redundant unit in December | Closed. Mtg on 03 Dec | |
TWG/04 | G. La Rosa | Check if PICsIT PPM during slews could be stopped. | Closed by INTGSCCR-87 (Dec 2007) | |
TWG/03 | P.Ubertini & J.-P. Roques |
Discuss within their teams and report on possible set up for observations of very bright transients. | Closed at IUG/ISWT Meeting, Mar 2007 | |
Co/11-08 | N. Lund | Discuss required changes for JEM-X UM with Salma Fahmy | Closed | |
Co/11-12 | SPI Team | Check warnings in Integral AO documentation on use of hex pattern and comment. | Closed for AO5 | |
Co/11-05 | A. Parmar | Have radiation dose analyses get started/done for various orbital scenarios. | Closed, see MEOR | |
Co/11-02 | S. Brandt | Notify MOC of procedure change at start of eclipse season to avoid JEM-X activation problems. | Closed | |
Co/11-01 | G. La Rosa | Send updated alert value for PMT 28V to MOC | Closed | |
Co/11-04 | M.Schmidt | Update report on belt passages taking into account future orbital evolution | Closed by circulated TN 19.12. | |
Co/11-03 | P. Kretschmar | Provide statistics on use of Hex pattern and other patterns. | Closed by mail 01-Dec-2006 | |
Co/11-06 | M.Schmidt | Provide list of possible changes in MOC support to PIs. | Closed by mail 04-Dec-2006 | |
Co/11-09 | M.Schmidt | Send to PK report by Alenia on AOCS performance and mask temperature. | Closed by mail 04-Dec-2006 | |
Co/11-10 | M.Schmidt | Find out which of the two startrackers is used and inform PIs. | Closed by mail 04-Dec-2006 | |
TWG/01 | P. Kretschmar | Check with ISDC which changes need to be implented for changed SPI TM. | Closed | |
TWG/02 | ISOC | Evaluate effects of changing minimum pointing time to at least 2400 s. | Closed 27-Nov-2006 |
|
Co/10-01 | R. Southworth | See with Flight Dynamics if table as requested by JPR can be provided. | Closed | |
Co/10-02 | G. La Rosa | Confirm that 1 TM packet for JEM-X can be taken from IBIS TM share for Earth observations. | Closed 22-Dec-2005 |
|
Co/10-03 | E. Kuulkers | Discuss with IBIS team possibility of having same risetime settings in OMC FFCal as in normal observations. |
Closed by GS-CR on 22-Mar-2006 | |
Co/10-04 | Instrument Teams | Check-out of instrument station readiness. | Closed |